Mobility|11.05.2026

Successful interaction for sustainable vehicle logistics by rail

In the past few weeks, a 620-metre-long freight train weighing 1,093 tons arrived at the Galliker Car Logistics Compound in Nebikon. Around 220 brand-new vehicles from Zeebrugge (BE) arrived safely and sustainably in Switzerland. The rail concept underlines how modern vehicle logistics and ecological responsibility go hand in hand at Galliker.

Successful interaction for sustainable vehicle log...

The environmentally friendly solution for transporting this large volume by rail began in Zeebrugge, Belgium. Immediately after the new cars arrived by ship, the ICO team reloaded the vehicles at the terminal onto 20 specialized rail wagons from the train operator Lineas. This direct transfer from ship to rail enabled a highly efficient logistics chain to be realized, which also sets new ecological standards: Transportation by rail corresponds to emissions of 3,555 kg CO2e.

Rail transportation on this scale requires the utmost precision in planning. In particular, the passage through the often busy Basel border station posed a logistical challenge, which was successfully mastered thanks to the excellent and cooperative coordination with SBB Cargo and Lineas. The unloading process at the Galliker terminal in Nebikon also required well thought-out timing: due to the impressive length of the train, the vehicles were unloaded efficiently in four stages between 06:00 and 11:00.

This success encourages us at Galliker to continue relying on sustainable rail solutions in vehicle logistics in the future. A big thank you goes to our partners Lineas and SBB Cargo for their excellent cooperation. Sustainable concepts such as this can only be successfully mastered through this shared spirit of partnership.

The continuation of this success story is already being planned. A third and fourth train with new wagons from various brands is expected shortly. Together, we are sending out a strong signal that impressively demonstrates the efficiency of international rail freight transport.

More articles

Successful interaction for sustainable vehicle log...
Infrastructure|19.10.2026

Galliker launches the “Zero Emissions Network” at its Aclens site

On October 19, 2026, the “Zero Emissions Network” was officially inaugurated at the “ Galliker ” site in Aclens. Following the opening of the new Logistics Center 2 in March, this marked the successful completion of the second major infrastructure project at the site in western Switzerland this year. As part of the official go-live event, representatives from politics, business, and government agencies, as well as customers and partners, had the opportunity to see the new infrastructure for themselves and experience firsthand how the individual technological components of the energy system work together efficiently.

Learn more
Successful interaction for sustainable vehicle log...
Infrastructure|13.10.2026

Imbach on the Future of Energy with the “Zero Emissions Network”

Generating solar energy, storing it, and using it to charge electric trucks: In Schachen, this vision is now a reality. With the official launch of the “Zero Emissions Network” on October 13, 2026, Imbach Logistik AG has reached another important milestone on the path to more sustainable transportation logistics.

Representatives from politics and business, as well as customers, partners, and government agencies, gained insight into the new infrastructure at the site. During a joint tour, participants inspected the facility and the electric vehicles and learned firsthand how the various components work together in daily operations.

Learn more
Successful interaction for sustainable vehicle log...
Human Resources|04.09.2026

46 graduates, 67 new apprentices and a newly opened Technical Academy

In early September, the headquarters of Galliker Transport AG was all about vocational training. Over the course of two eventful days, the family-owned company celebrated the successful completion of apprenticeships by 46 young professionals, welcomed the parents of 67 new apprentices, and opened the newly renovated Technical Academy.

Learn more
Galliker Transport AG

Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2026 Galliker Transport AG