Infrastructure|07.10.2021

Reduction in heating oil consumption in Möhlin

At Logistics Center 2 in Möhlin, the use of waste heat from the refrigeration system was optimized this summer. Thanks to the necessary hydraulic and software adjustments, a higher heat output of around 100 kW and longer operating times were achieved.

Reduction in heating oil consumption in Möhlin

Initial calculations have shown that we can save around 7,500 - 10,000 liters of heating oil or around 25,000 kg of CO2 per year. This means a halving of the current consumption. The installation of a control valve with integrated heating measurement allows a precise assessment of the optimization achieved. A further step towards Green Logistics by Galliker.

More articles

Reduction in heating oil consumption in Möhlin
Infrastructure|19.10.2026

Galliker launches the “Zero Emissions Network” at its Aclens site

On October 19, 2026, the “Zero Emissions Network” was officially inaugurated at the “ Galliker ” site in Aclens. Following the opening of the new Logistics Center 2 in March, this marked the successful completion of the second major infrastructure project at the site in western Switzerland this year. As part of the official go-live event, representatives from politics, business, and government agencies, as well as customers and partners, had the opportunity to see the new infrastructure for themselves and experience firsthand how the individual technological components of the energy system work together efficiently.

Learn more
Reduction in heating oil consumption in Möhlin
Infrastructure|13.10.2026

Imbach on the Future of Energy with the “Zero Emissions Network”

Generating solar energy, storing it, and using it to charge electric trucks: In Schachen, this vision is now a reality. With the official launch of the “Zero Emissions Network” on October 13, 2026, Imbach Logistik AG has reached another important milestone on the path to more sustainable transportation logistics.

Representatives from politics and business, as well as customers, partners, and government agencies, gained insight into the new infrastructure at the site. During a joint tour, participants inspected the facility and the electric vehicles and learned firsthand how the various components work together in daily operations.

Learn more
Reduction in heating oil consumption in Möhlin
Human Resources|04.09.2026

46 graduates, 67 new apprentices and a newly opened Technical Academy

In early September, the headquarters of Galliker Transport AG was all about vocational training. Over the course of two eventful days, the family-owned company celebrated the successful completion of apprenticeships by 46 young professionals, welcomed the parents of 67 new apprentices, and opened the newly renovated Technical Academy.

Learn more
Galliker Transport AG

Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2026 Galliker Transport AG