Infrastructure|25.06.2024

Pioneering e-power tunnel project

Together with CKW and other partners, we have made great progress in the development of our charging infrastructure in recent months and years. One of the milestones is our e-power tunnel, which supplies 28 truck parking spaces with electricity for the installed charging stations. CKW has explained the background to the idea and the resulting power in its blog post - you can read it here.

Pioneering e-power tunnel project

We are pleased to have found a reliable partner in CKW AG to supply the necessary components. Special thanks also go to our long-standing partners, Thomas Lüem Partner AG (electrical planning), Fent AG (civil engineers / overall planners) Frey + Cie Elektro AG (electrical installations), who actively supported us in the development and implementation of this pioneering project from the very beginning and made a significant contribution to its success. Of course, we would also like to thank all the other companies involved.

Thomas Müller, Head of Infrastructure Services

More articles

Pioneering e-power tunnel project
Human Resources|05.06.2026

Galliker Green Logistics Day 2026 - Focus on people & innovations

"Logistics connects people, companies and markets. Today, however, it also connects something else: responsibility towards future generations, towards our environment and towards Switzerland as a business location." With these words, CEO Peter Galliker opened the Green Logistics Day 2026 at the Umwelt Arena Schweiz in Spreitenbach on June 2. The event was aimed at members of the Galliker Green Logistics Association and offered a comprehensive platform to present the company's sustainability strategy and current developments in the field of sustainable transport and logistics solutions in a practical way.

Learn more
Pioneering e-power tunnel project
Mobility|11.05.2026

Successful interaction for sustainable vehicle logistics by rail

In the past few weeks, a 620-metre-long freight train weighing 1,093 tons arrived at the Galliker Car Logistics Compound in Nebikon. Around 220 brand-new vehicles from Zeebrugge (BE) arrived safely and sustainably in Switzerland. The rail concept underlines how modern vehicle logistics and ecological responsibility go hand in hand at Galliker.

Learn more
Pioneering e-power tunnel project
Mobility|16.04.2026

Galliker member of the Electric Mobility Roadmap 2030 since 2025

The roadmap is a platform for networking all players active in the field of electrification of transport and is under the patronage of DETEC (Federal Department of the Environment, Transport, Energy and Communications). The participants contribute to the development of electromobility with their own measures.

Learn more
Galliker Transport AG

Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2026 Galliker Transport AG