Infrastructure|19.12.2022

Development of a megawatt battery charging system for heavy commercial vehicles

Battery-buffered charging container to make commercial vehicles suitable for long journeys and relieve pressure on power grids. Designwerk Technologies AG, based in Winterthur, is building a new type of megawatt-class charging station. It is designed to enable fast charging of electric trucks within 45 minutes.

Development of a megawatt battery charging system ...

The partnership-based demonstration project aims to make e-trucks suitable for long journeys and relieve the strain on grids. The technical basis is a new charging standard for heavy commercial vehicles.

One of the world's first megawatt charging stations is currently being built at Designwerk Technologies AG. The charging station in container format is set to charge electric trucks for the first time in spring 2023. It will be up to six times faster than conventional high-performance charging stations with 350 kW output. Integrated battery buffers are designed to avoid peak loads. The aim is also for the charging stations to be grid-friendly. The scientific support for these technical developments is being provided by the Swiss Federal Office of Energy (SFOE) and renowned industrial partners. On the research side, the Bern University of Applied Sciences (BFH) and the University of Applied Sciences of Eastern Switzerland (OST) are involved in the project.

Charging infrastructure for commercial vehicles is essential

Heavy goods vehicles are of key importance for the energy transition and achieving climate targets. Around 6.6 million trucks are in use on Europe's roads. They transport 76.7% of all freight on land. Consequently, it is important to increase the proportion of low-emission or emission-free means of transport here too. "Long-distance trucks, ships and aircraft in particular require a new type of charging infrastructure. It differs from the infrastructure for electric cars and makes it possible to charge heavy commercial vehicles in a short time. This helps to ensure that zero-emission freight transport reaches all areas of application," explains Vivien Dettwiler, member of the Designwerk management team. To ensure that the system meets with the necessary acceptance, it is based on the new charging standard Megawatt Charging System, or MCS for short. This was launched internationally in June of this year.

Security of supply as part of the project

The realization that powerful charging stations place demands on grids is an integral part of the project's starting point. The demonstration operation is therefore intended to show ways in which a high-performance charging network and security of supply can go hand in hand. "We install Second Life e-truck batteries in our charging containers as a buffer to prevent peak loads. This not only eliminates the need to expand the grid: the storage system should even be able to feed renewable electricity back into the grid," says Dettwiler. Similar to bidirectional charging, electromobility can be used as part of supply solutions. Demonstration systems at Galliker Transport AG, Käppeli Logistik and Murg Flums Energie will prove that this works.

Key technical data Mega Charger demonstration system

Prototype construction site: Winterthur, Switzerland
Demonstration project: Megawatt battery charging system for heavy commercial vehicles
Product name: Stationary Battery Backed Mega Charger
Dimensions L×W×H: 8500×2550×3000mm
Weight: 25 t
AC input data: 88-400 kW, TN 3x125-580 A, 400 VAC +-10%, 50 Hz
AC plug type: CEE 125 and fixed connection, 3P+N+PE
Battery buffer: 1,800 kWh
Technology Battery storage: NMC, second life use or new
DC output data: max. 3,000 A, 500-900 V, max. 2,100 kW
DC Plug type: Liquid-cooled, CCS type 2, MCS
Efficiency: Mains > battery > vehicle > approx. 0.9
Operation: Status display, buttons
Connectivity: OCPP 1.6j, Modbus
Thermal management: Water / air: stepless, temperature-dependent
Transport: Container Transportable according to UN38.3

Find out more about the megawatt battery charging system

More articles

Development of a megawatt battery charging system ...
Human Resources|24.07.2026

2025/2026 CSR Report: Now Online

We are pleased to present our 2025/2026 CSR Report. As a family-owned business, we have been consciously committed to sustainability for many years. For us, sustainability means acting responsibly and thoughtfully in all our activities and business areas, thinking long-term, and treating the environment, our customers, partners, and employees with respect.

Learn more
Development of a megawatt battery charging system ...
Infrastructure|23.07.2026

ASTAG Charge – The Charging Platform by Members, for Members

For the past few days, we have been making selected electric truck charging stations at various Galliker locations available to third parties for charging.

Learn more
Development of a megawatt battery charging system ...
Mobility|16.07.2026

International E-Transport between Italy and Switzerland

For us, sustainable logistics doesn't stop at the national border. With our all-electric vehicles, we're proving that even international shipments can already be carried out reliably and cost-effectively today.

Learn more
Galliker Transport AG

Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2026 Galliker Transport AG