Infrastructure|06.11.2023

Areal-Süd; medium-voltage electricity grid incl. battery storage

Just under a year after the commissioning of our medium-voltage electricity grid on our northern site in Altishofen / Dagmersellen (see article from May 16, 2023), the second site grid also went into operation on October 24, 2023, this time in the southern part of our site.

Areal-Süd; medium-voltage electricity grid incl. b...

It connects all of our Car Logistics buildings in Altishofen and Nebikon as well as the workshops and the administration building. All construction and installation work was completed on time. As in the northern part of the site, the aim here in the south was to be able to use the solar power we produce ourselves in all buildings.

This means that almost 3.9 MWp of power can be used wherever it is needed. Regardless of the roof on which the electricity is produced. For further optimization, a battery with a storage capacity of 960 kWh was also integrated into this area network. This makes it possible to take clean solar power into the night and use it instead of feeding it into the grid during the day.

More articles

Areal-Süd; medium-voltage electricity grid incl. b...
Human Resources|05.06.2026

Galliker Green Logistics Day 2026 - Focus on people & innovations

"Logistics connects people, companies and markets. Today, however, it also connects something else: responsibility towards future generations, towards our environment and towards Switzerland as a business location." With these words, CEO Peter Galliker opened the Green Logistics Day 2026 at the Umwelt Arena Schweiz in Spreitenbach on June 2. The event was aimed at members of the Galliker Green Logistics Association and offered a comprehensive platform to present the company's sustainability strategy and current developments in the field of sustainable transport and logistics solutions in a practical way.

Learn more
Areal-Süd; medium-voltage electricity grid incl. b...
Mobility|11.05.2026

Successful interaction for sustainable vehicle logistics by rail

In the past few weeks, a 620-metre-long freight train weighing 1,093 tons arrived at the Galliker Car Logistics Compound in Nebikon. Around 220 brand-new vehicles from Zeebrugge (BE) arrived safely and sustainably in Switzerland. The rail concept underlines how modern vehicle logistics and ecological responsibility go hand in hand at Galliker.

Learn more
Areal-Süd; medium-voltage electricity grid incl. b...
Mobility|16.04.2026

Galliker member of the Electric Mobility Roadmap 2030 since 2025

The roadmap is a platform for networking all players active in the field of electrification of transport and is under the patronage of DETEC (Federal Department of the Environment, Transport, Energy and Communications). The participants contribute to the development of electromobility with their own measures.

Learn more
Galliker Transport AG

Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2026 Galliker Transport AG