Mobility|22.03.2021

41,500 kg CO2 savings per year thanks to the use of Ecocombi

Galliker Transport SA, Liége in Belgium has been part of the Belgian Ecocombi pilot project since April 2018. Every day, Galliker uses the Ecocombi to transport temperature-controlled healthcare products from the production plant in Lessines to the main warehouse at Galliker in Liége.

41,500 kg CO2 savings per year thanks to the use o...

Thanks to the special permit, which applies exclusively to this route, up to 49 pallets per transport can be efficiently transported from A to B with a length of 25.5 meters and a total weight of 60 tons. This saves 80 truck journeys and 41,500 kg of CO2 per year.

More articles

41,500 kg CO2 savings per year thanks to the use o...
Infrastructure|21.01.2026

Solar power from a new perspective - our PV façade in Aclens

Photovoltaic systems on roofs are almost standard today. In Aclens, we are therefore going one step further and rethinking solar power.

Learn more
41,500 kg CO2 savings per year thanks to the use o...
Infrastructure|13.01.2026

Groundbreaking ceremony for pioneering E-Park & Ride project

On 13 January 2026, Galliker Transport AG reached an important milestone: the traditional ground-breaking ceremony for the new "E-Park & Ride" project took place in Dagmersellen. At the same time, the completed E-Power Bridge was officially opened just a few metres away. Both projects are part of a modern, energy-efficient and future-oriented infrastructure for electric mobility in heavy goods transport.

Learn more
41,500 kg CO2 savings per year thanks to the use o...
Infrastructure|12.11.2025

"Greenpower" project to be discontinued

The "Greenpower" innovation project in Dagmersellen will not be continued following a joint agreement between the partners involved. Following a comprehensive strategic reassessment by Emmi Switzerland, this decision was taken after consultation with the project partners. This decision reflects the economic and technological framework conditions that have materialized in the course of project development. In particular, the long-term economic viability, the complexity of implementation and the regulatory framework conditions were re-analyzed.

Learn more
Galliker Transport AG

Galliker Green Logistics

Kantonsstrasse 2
CH-6246 Altishofen
© 2026 Galliker Transport AG